List of EPD Registers of Asbestos Professionals
Before carrying out any asbestos removal work, the owner of the premises concerned is required to submit an asbestos investigation report and abatement plan prepared by registered asbestos consultant to EPD at least 28 days in advance. The owner is also required to notify EPD of the date of commencement of such work at least 28 days in advance. All asbestos removal work must be carried out by registered asbestos contractor and supervised by registered asbestos supervisor. During the asbestos abatement work, the work should be monitored by registered asbestos consultant and airborne fibres should be monitored by registered asbestos laboratory.
Asbestos consultants, contractors, supervisors and laboratories must register if they want to practice in the asbestos abatement profession. The registers of registered asbestos consultants, contractors, supervisors and laboratories are kept by EPD and open to the public for inspection.
What are the respiratory protective equipment that have been approved by the Commissioner for Labour for protection against asbestos dust at work?
- Disposable, half-face particulate respirator
- Half-face particulate filter (cartridge) respirator
- Full-face particulate filter (cartridge) respirator
- Powered air-purifying respirator
- Supplied-air respirator
Concise Guide to Control of Asbestos (EPD)
14. Apart from the power of issuing Asbestos Abatement Notice to abate asbestos emissions, the Ordinance also provides a registration system to control asbestos work. Asbestos consultants, contractors, supervisors and laboratories must register if they want to practice in the asbestos abatement profession. The registers of registered asbestos consultants, contractors, supervisors and laboratories are kept by EPD and open to the public for inspection.
15. Before carrying out any asbestos removal work, the owner of the premises concerned is required to submit an asbestos investigation report and abatement plan prepared by registered asbestos consultant to EPD at least 28 days in advance. The owner is also required to notify EPD of the date of commencement of such work at least 28 days in advance. All asbestos removal work must be carried out and supervised by registered personnel in compliance with prescribed standards.
16. The Ordinance also bans the importation or sale in Hong Kong of any quantity of 2 types of asbestos, namely amosite and crocidolite, or any item containing the said asbestos unless it is goods in transit or having exemption under the Ordinance.
Laws & Regulations - Air Pollution Control Ordinance (EPD)
In Section 51 - 80 of Control of Environmental Asbestos, apart from the power of issuing Asbestos Abatement Notice to abate asbestos emissions, the Ordinance also provides a registration system to control asbestos work. Details of the Laws, please refer to Bilingual Laws Information System of Department of Justice.
Laws & Regulations for Safety & Health at Work with Asbestos (LD)
Details of the Laws, please refer to Bilingual Laws Information System of Department of Justice.
Code of Practice for Asbestos (LD)
This COP is an approved COP issued by the Commissioner for Labour under Section 7A(1) of the Factories and Industrial Undertakings Ordinance (Cap 59) for the purpose of providing practical guidance in respect of the provisions of the Factories and Industrial Undertakings (Asbestos) Regulation (L.N. 74 of 1997).
Code of Practice for Asbestos Waste (EPD)
This Code of Practice is a statutory document provide guidance and advice on the collection, storage, treatment, transportation and disposal of waste. It was first published in January 1993 under Section 35 of the Waste Disposal Ordinance.
For download the document, please go to EPD web page.
Asbestos Removal of Unauthorised Building Works
Asbestos In Hotel
Hot water pipe lagging
Steam pipe lagging
Pipe flange gasket
Drainage / soil pipe (cement pipe)
Air duct flange gasket
Insulation board
Through wall caulking
Chimney lagging
Flue lagging
Boiler lagging
Boiler gasket
Calorifier lagging
Fire barrier in bus bar
Cable sealant / caulking
Switch boxes
Fire proofing material
Vinyl floor tile
Acoustic tile / insulation / plaster
and etc